XYD-130/180/200 crawler drilling rig
Model |
XYD-130 |
XYD-180 |
XYD-200 |
Drilling depth (m) |
130 |
180 |
200 |
Hole diameter (mm) |
220 |
220 |
325 |
Final hole diameter (mm) |
75 |
75 |
75 |
Drill pipe diameter (mm) |
42-60 |
42-60 |
42-60 |
Drilling angle(°) |
90-75 |
90-75 |
90-75 |
Supporting power (kW) |
13.2 |
13.2 |
15 |
Weight (kg) |
3350 |
3400 |
3600 |
Drill size length*width*height (mm) |
3.8x1.95x2.7 |
3.8x1.95x2.7 |
3.8x1.95x2.7 |
Vertical shaft speed (r/min) |
142/285/570 |
130/300/480/730/830/1045 |
64/128/287/557 |
Vertical axis stroke (mm) |
450 |
450 |
450 |
Track specification (mm) |
350x90x48 |
350x90x48 |
350x90x48 |
Climbing angle(°) |
20° |
20° |
20° |
xíngzǒu sùdù (km/H) |
10 |
10 |
10 |
yèyā zhī tuǐ gāodù (mm) |
1300 |
1300 |
1300 |
édìng fùhè (ton) |
2 |
2 |
5 |
zuān tǎ jiégòu |
quán yèyā |
quán yèyā |
quán yèyā |
yǒuxiào gāodù (m) |
6 |
6 |
6 |
liúliàng (L/min) |
160 |
160 |
160 |
zuìdà yālì (Mpa) 展开 1331/5000Walking speed (km/H) |
10 |
10 |
10 |
Hydraulic leg height (mm) |
1300 |
1300 |
1300 |
Rated load (ton) |
2 |
2 |
5 |
Drill tower structure |
Full hydraulic |
Full hydraulic |
Full hydraulic |
Effective height (m) |
6 |
6 |
6 |
Flow (L/min) |
160 |
160 |
160 |
Maximum pressure (Mpa) |
1.3 |
1.3 |
1.3 |
Number of reciprocations (times/min) |
165 |
165 |
165 |
Diameter of suction pipe (mm) |
51 |
51 |
51 |
Outlet height diameter (mm) |
32 |
32 |
32 |
Note: The above parameters are subject to change without further notice, please refer to the actual product.
Shandong Julong Equipment Manufacturing Co., Ltd.
Sales:0539-4271399
Mobile phone :186 6951 6582
Service:400-699-0058
E-mail:sdjlzj@qq.com
Address: No. 29, Wenhe 3rd Road, Economic Development Zone, Mengyin County, Linyi City, Shandong Province

Scan and follow us
- CONTACT
- Online Repair
- TEL +86-0539-4271399
- TOP
Copyright©Shandong Julong Equipment Manufacturing Co., Ltd. 鲁ICP备12009262号 Powered by www.300.cn