NEWS
Your location:
Homepage
/
/
/
Measures in use during running-in period of water well drilling rig

Measures in use during running-in period of water well drilling rig

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2019-03-06
  • Views:0

(Summary description)The operation of water well drilling rigs must be operated by professionals, because professionals have a better understanding of the performance of water well drilling rigs.

Measures in use during running-in period of water well drilling rig

(Summary description)The operation of water well drilling rigs must be operated by professionals, because professionals have a better understanding of the performance of water well drilling rigs.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2019-03-06
  • Views:0
Information
  The operation of water well drilling rigs must be operated by professionals, because professionals have a better understanding of the performance of water well drilling rigs. And there is a certain degree of operating experience, the following editor will talk about maintenance measures with everyone.
  1. The operator should accept the training and guidance of the manufacturer, have a full understanding of the structure and performance of the drilling rig, and obtain certain operation and maintenance experience before operating the machine. The product operation and maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the operation and maintenance manual and operate and maintain according to the requirements of the manual.
  2. Pay attention to the working load during the running-in period. Generally, the working load during the running-in period should not exceed 80% of the rated working load, and a suitable workload should be arranged to prevent the occurrence of overheating caused by long-term continuous operation of the machine.
  3. Pay attention to frequently observe the instructions of each instrument. If there is an abnormality, stop and eliminate it in time. If the cause is not found and the fault is not eliminated, the operation should be stopped.
  4. Pay attention to frequently check the lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) level and quality, and pay attention to check the sealing of the whole machine. Excessive oil and water shortage is found during the inspection, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended to add grease to the lubrication point during the running-in period (except for special requirements).
  5. Keep the machine clean, adjust and tighten loose parts in time to prevent them from being worn out or lost due to loosening.
  6. At the end of the running-in period, compulsory maintenance of the machine should be carried out, inspection and adjustment should be done, and attention should be paid to the replacement of oil.
  In short, the maintenance requirements of water well drilling rigs during the running-in period can be summarized as: load reduction, attention to inspection, and enhanced lubrication. As long as you pay attention to and implement the maintenance and maintenance of the construction machinery during the running-in period as required, it will reduce the occurrence of early failures, prolong the service life, improve work efficiency, and bring you more economic benefits.

Scan the QR code to read on your phone

09-16

Construction methods and main features of full-casing full-rotation drilling rig

My country’s current full-rotation casing drilling rig has not achieved independent research and development.In the 1990s,my country introduced a full set of pipe equipment from Japan,
09-16

New upgrade of mechanical top drive water and gas dual purpose drilling rig

JDL350B drilling rig is a mechanical top driving force head drilling rig independently developed by the company.
11-27

How to solve the slip phenomenon of drilling rig?

How to solve the slipping phenomenon of drilling rig?For this problem,everyone must first understand why slippage occurs before they can think of a solution.
08-11

Shandong Julong Equipment Manufacturing: To be a leader in intelligent manufacturing in the drilling equipment industry!

Shandong Julong Equipment Manufacturing Co., Ltd. focuses on improving the execution of manufacturing enterprises.
01-08

Wang Yumin came to our county to investigate enterprise talent work

On May 4, Wang Yumin, deputy head of the Organization Department of the Municipal Party Committee and director of the Municipal Party Committee’s Veteran Cadres Bureau,

Shandong Julong Equipment Manufacturing Co., Ltd.

Sales:0539-4271399
Mobile phone :186 6951 6582
Service:400-699-0058
E-mail:
sdjlzj@qq.com
Address: No. 29, Wenhe 3rd Road, Economic Development Zone, Mengyin County, Linyi City, Shandong Province

tp

Scan and follow us

Copyright©Shandong Julong Equipment Manufacturing Co., Ltd.     鲁ICP备12009262号       Powered by  www.300.cn